Hornady Lock-N-Load Powder Measure with Case-Activated Pow Manual de usuario Pagina 11

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 20
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 10
- 10 -
Step 1: Assembling the Case Activated Powder Drop Rotor Arm
Reinstall the Rotor with the handle side to the right (metering opening facing you).
Place the Metering Unit back into the Rotor.
Attach the Case Activated Powder Drop Rotor Arm (#3) to the right side of the Rotor
using two Button Head Cap Screws (#4).
Fig. 1: Attaching the
Case Activated Powder
Drop Rotor Arm.
L-N-L POWDER MEASURE
Vista de pagina 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 19 20

Comentarios a estos manuales

Sin comentarios